Progressive Die Stamping After Laser Cut and Bent Sheet Metal Parts

A progressive die makes parts in minutes but takes months to build and wants a design that has stopped, so quantity and design stability choose between die and laser.

A strip of steel carrying identical stamped parts at successive stages along it, and finished stamped brackets beside it.

A press running at 600 strokes per minute delivers 10,000 finished parts in under 17 minutes, since each stroke ejects one. Before the first of those strokes, the die has to be designed station by station, its steel ordered and machined, assembled on the bench, timed and tried in the press. The press makes the batch in a coffee break, and the die takes months.

That gap is the whole shape of the decision between laser cut and bent parts and stamped parts. One process spends its time on every part and nothing on tooling. The other spends it the opposite way. The sections below put numbers on both sides with the stroke rates of presses, the design rules of the die as die engineers describe them, and the cut times of a laser, so a buyer can see where a run of a few hundred parts ends and a run of tens of thousands begins.

What Changes When a Part Moves From Laser and Brake to a Die

In laser and brake work, a flat blank is cut by a beam from a program and bent on a press brake with standard tooling, so a part exists the day the drawing and the sheet exist. In progressive stamping, a continuous strip passes through one die set with several stations. Each stroke advances the strip by one progression, and pilots in the die locate it before the work of that stroke is done. The part stays attached to a carrier, the material that carries it from station to station, until the final station trims it off.

Each process counts its work in a different unit. Laser and brake work is counted in sheets and setups, as the nesting piece in these resources shows. Die work is counted in strokes and dies. A feature on a drawing becomes work in a station: a die design guide in The Fabricator notes that, in general, each station is responsible for one operation, and that a complex part is often given one or two blind stations, left empty in case something has to be added or changed later.

Table 1. The same sheet metal part under two processes, from die engineers’ guides, a press maker’s specification and the arithmetic of these resources
Aspect Laser and press brake Progressive die
What is made first A cut program and a bend program A die set of several stations
Time before the first part Material arrival plus programming Die design, steel and components ordered, machining, bench assembly, timing and tryout in the press
Rate once running Minutes of beam time per sheet; bending per part One part per stroke; the Bruderer BSTA 410-110 runs 80 to 1,170 strokes per minute
A design change An edited file and a new nest Die rework, since each feature is a station
Tolerance Set by cut, bend and springback Set by clearances and pilots; one die described in The Fabricator held critical dimensions to 0.025 mm (0.001 in) tolerances

Every row of the table points the same way. A die takes the design as a promise, and changing it later costs time as well as work.

A laser and a brake can follow a design that moves. A progressive die follows a design that has stopped.

Strokes per Minute and the Hours a Batch Takes

Press speed is a published number. A press of the kind used for fine work, the Bruderer BSTA 410-110 at TU Darmstadt’s institute for production technology and forming machines, is listed with a press force up to 410 kN, a stroke rate of 80 to 1,170 strokes per minute and a stroke length of 16 to 64 mm (0.63 to 2.52 in), fed by a servo feed from decoilers and recoilers. The tables below take 200 and 600 strokes per minute, two points well inside that range, since the speed a given die runs at is set by its forms and its material rather than by the press alone.

Turn the stroke rates into hours for a batch. The arithmetic below assumes one part per stroke and no stops.

Table 2. Press time for one part per stroke, from stroke rates of 200 and 600 per minute (arithmetic)
Quantity At 200 strokes per minute At 600 strokes per minute Laser cutting time for the blanks alone, 2 mm 304 at 130 parts per sheet
1,000 parts 5 minutes 1.7 minutes 8 sheets, about 20 to 24 minutes
10,000 parts 50 minutes 17 minutes 77 sheets, about 3.2 to 3.9 hours
100,000 parts 8.3 hours 2.8 hours 770 sheets, about 32 to 39 hours

The last column uses the layout of the nesting piece: 130 blanks of 180 by 110 mm per 2,500 by 1,250 mm sheet, a contour of 75.4 m per sheet, and GWEIKE’s 25 to 30 m/min for 2 mm stainless on 6 kW. It counts the beam only, and a laser cut blank still needs bending, which adds hours of its own.

Two conclusions follow. Up to a few thousand parts, the laser’s hours are modest, so a die saves little press time and a lot of risk. At tens of thousands, the beam’s hours reach days, the press’s reach a shift, and the difference starts to show in the schedule as well as the cost of labor.

Die Lead Time and the Design That Has to Stand Still

A die is built once, and its lead time starts when the design stops moving. The Fabricator’s account of a complex progressive stamping follows the order: the customer print, the stock strip width, thickness and progression length, the number of stations, the pilots, the tonnage, then the die set, tool steel, punches, pilots and coil stock ordered, and the tool assembled, its clearances checked in every station and its timing programmed against the 360 degree stroke of the press. Each step waits for the one before, and during those weeks the part is either still being made by laser and brake, or not made at all.

The die also brings design rules that the laser does not. Cimatron’s die quoting guide asks for a carrier width of twice the material thickness, wider in larger dies so the strip can be pushed through. The Fabricator’s die design article adds one to two material thicknesses per side of excess strip for trimming, and holes large enough to serve as pilots if the part is to be piloted through its own holes, placed as far apart as possible for accuracy. A tight tolerance on such a hole is a risk, since even slight elongation during forming can turn the part into scrap, and pilots placed in the carrier or the scrap avoid it. SSAB’s bending guidance applies to the forms as well: grains run along the rolling direction, so bends across it survive a tighter radius.

Compare those with the rules of the press brake. Bystronic puts holes at least six thicknesses from a bend line and the flange at least six thicknesses long for air bending, and Durma’s tables put the formed radius near 16 percent of the die opening in mild steel. A part designed around the brake can need changes before a die accepts it. A small hole the laser cuts without comment can be too small to punch or to pilot from, and a part with little room around it leaves no space for a carrier. Both call for a look at the drawing before a die is designed.

  • Decide which holes the pilots use, and keep tight hole tolerances off them.
  • Leave room for a carrier of about twice the thickness and a trim allowance at the edges.
  • Check radius against thickness, and orient bends across the rolling direction.
  • Freeze the drawing, then count the weeks.

Press Force and the Size of Part a Die Can Carry

A die is limited by the press it sits in. Durma’s estimate for air bending gives force in kN as bend length times thickness squared times tensile strength times 1.42, divided by the V opening times 1,000, in millimeters and N/mm². Take a 60 mm (2.4 in) bend in 2 mm mild steel of 450 N/mm² over a 16 mm opening: the force is about 9.6 kN. A 410 kN press such as the Darmstadt Bruderer has a large margin for that bend.

The same arithmetic shows the limit on size. A 1,000 mm bend in the same sheet needs about 160 kN, and Durma puts stainless at 1.4 to 1.5 times mild steel, so the same bend in stainless takes 224 to 240 kN. Those figures are bends in a brake, not in a die, but the lesson carries over: force scales with bend length, so a progressive die suits parts with short features.

Part size also meets the carrier. A Fabricator column on carrier design notes that carrier strips are often too weak to support the weight of the strip, and that the lack of strength grows once the strip is fed; Cimatron advises stiffening beads or a lanced, formed edge on carriers when large parts are made from thin material. Trimming much material from one side of the coil can release stresses and bow the strip into camber, and the more progressions a die has, the greater the risk to feed and pilot alignment. The strip also has to be fed, so the part’s width is tied to the strip’s, and the coil it comes from. ArcelorMittal’s tolerance tables describe coils by mass per meter of width, with a 25-tonne coil at 1,250 mm width described as 20 t/m, and a die for a small bracket can be fed with a narrower strip cut from such a coil.

Wear, Sharpening and the Approved Sample

A die changes as it runs. Punches dull, clearances open and burr grows, so the last part of a run differs from the first. Pilots wear and mark the strip too: The Fabricator notes that pilots rubbing on the pilot hole over a long stripper travel can raise a burr on the hole and gall the pilots, and that a feed released at the wrong point in the stroke elongates pilot holes and bends or breaks pilots. Wila’s tooling notes make the same point on a smaller scale for press brake dies: a V opening under six thicknesses raises force and wears the flanks.

A press brake die and punch are ground to a tolerance of about 0.0004 in (0.01 mm), per Bystronic, and a progressive die has to hold the same sort of tolerance over many stations. The approved sample is therefore the first part from a die that has been run and measured, and the sample’s measurements become the reference for every later lot.

Three events change the part while the die runs, and each calls for a re-check.

  • A new coil lot arrives, with its own yield strength and springback.
  • The die is sharpened, which changes the clearance and the burr side.
  • The press or the feed is changed, which alters the strip position at each station.

Laser and brake parts have their own versions of the same events, as the bending and nesting pieces describe. What differs is the cost of a mistake: a laser nest can be re-run in hours, and a die can be reworked in days or weeks.

Quantity Bands and the Place of Laser and Brake Work

Where the bands fall depends on the part. The Fabricator’s die design article names the two factors that usually decide whether a part is made progressively, the volume of production and the complexity of the part, and warns that where volumes are borderline, a more complex die and the material a ladder carrier wastes can make a series of separate operations the better choice. No published standard sets the quantity, so the bands below come from the press and laser hours of the previous section.

Table 3. Quantity bands for sheet metal parts, from the figures above and the arithmetic of the previous section
Quantity per year Typical choice Why
1 to a few thousand Laser and press brake Hours of beam time; no tool to wait for; a design that can still change
A few thousand to tens of thousands Laser and brake, with a die studied Beam hours reach a day or more; die drawing worth starting if the design is fixed
Tens of thousands and above Progressive die Press hours are a fraction of laser hours once the design is fixed (the bands are the writer’s reading of the arithmetic, not a published rule)

The middle band is where bridge quantities live. A part can run for several months by laser and brake while the design settles, and the die, if it is justified, is commissioned in parallel. The weeks of the die lead time overlap with the months of the run, and the switch happens when the die has passed its first sample.

Moving to the die also changes the part. A laser-cut blank has a different edge from a punched one: SSAB asks for thermal cut and sheared edges to be deburred before bending, and an edge made by a die has a burr and a break pattern of its own, so a part moved to the die is checked as a new first article.

The die pays when the design has stopped and the quantity is high. Before that, the laser and brake are the tool.

Running Both Processes While the Die Is Built

The die’s weeks are not idle weeks. A part that is ordered now keeps shipping from laser and brake, and the die is built on the side. The weeks of design, build and tryout set how long the two run together, and the length of the overlap decides how many parts the older process still has to deliver.

Take an assumed case of 20,000 parts a year, which is about 385 a week. With an assumed die build of 16 weeks, the laser and brake supply about 6,150 parts before the first stamped part exists. On the nest of the earlier section that is 48 sheets of 130 blanks, about two hours of beam time. The cut is small next to the weeks, which is why the overlap is rarely a problem for the laser and is often a problem for the bending and finishing that follow it.

The overlap also gives a reference. Parts from the older process, measured at the first piece and kept, become the standard the die’s first samples are compared with. Bend angle, flat length, hole position and edge condition are read on both, and a difference is traced to the die or the material lot before the old process is retired.

A buyer can set the switch as a rule written before the die is built: the quantity at which the old process stops, the sample count that has to pass and the measurements that count. Written down early, that rule stops the argument about when to switch from becoming an argument about every part.

What to Carry Over and What to Re-check

Not everything changes when the process does. The drawing, the material, the finish and the tolerances that matter stay the same. What differs is how each is delivered.

  • Carry over the material grade and thickness, and measure springback again on the new tooling.
  • Re-measure bend angles and flat dimensions on the first die parts against the laser and brake parts.
  • Confirm the edge condition where the part will be welded, coated or mated.
  • Agree on the quantity at which the old process is retired, and the number of parts kept from the old process as reference.

A tight tolerance on a die part is held by clearances, pilots and sharp punches, which means it is paid for in die upkeep for as long as the die runs. A drawing that asks for the tight band only on the features that need it, and a wider band elsewhere, gives the die less to defend.

Parts that begin as a few laser cut and bent pieces and grow past a few thousand can run through low-volume sheet metal work and into bridge production while the die is built, so the supply is steady on the day the first stamped part is approved.

Sources and Further Reading

Request a Sheet Metal Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Sheet Metal chosen.

Request a Quote